A single link to the first track to allow the export script to build the search page
  • Administration and Management
  • 391 Geosynthetic-Reinforced Soil for Bridge Applications

    P14-5200 National Implementation and Research for Geosynthetic-Reinforced Soil-Integrated Bridge Structure Technology

    P14-5200_A National Implementation and Research for Geosynthetic-Reinforced Soil-Integrated Bridge Structure Technology

    • Daniel E Alzamora ;

    Presentation, Poster

    P14-5200_B National Implementation and Research for Geosynthetic-Reinforced Soil-Integrated Bridge Structure Technology

    • Michael T Adams ;

    Presentation, Poster

    P14-5209 Sheffield Project Design for Massachusetts Department of Transportation

    P14-5209_A Sheffield Project Design for Massachusetts Department of Transportation

    • Rich Tobin ;

    Presentation, Poster

    P14-5210 Contractor Experience with Geosynthetic-Reinforced Soil Abutments

    P14-5210_A Contractor Experience with Geosynthetic-Reinforced Soil Abutments

    • Colby Barrett ;

    Presentation, Poster

    P14-5211 Design and Performance of First Geosynthetic-Reinforced Soil-Integrated Bridge Structure on the National Highway System

    P14-5211_A Design and Performance of First Geosynthetic-Reinforced Soil-Integrated Bridge Structure on the National Highway System

    • James B Higbee ;

    Presentation, Poster

    Z14-391 Presiding Officer

    Z14-391_A Presiding Officer

    • Jennifer E Nicks ;

    Presentation, Poster